Industrial Devices India Pvt. Ltd.
Thermal Power Plant Chlorination
Client Project System Commissioned
M/s.Bechtel International Inc. Enron Power Project. 1000 kgs/hr Chlorine Leak Neutralization System. 1998
Andhra Pradesh State Electricity Board Kothagudem TPS-V 3 x 120 kg/hr Chlorination System (Consultant : Desein Ltd. ) May 2000
Neyveli Lignite Corporation Ltd. Thermal Power Station Expansion I 3x100 kg/hr Chlorination, Leak Absorption and Chemical Dosing System (Consultant : MECON) 2002
M/s. BSES Kerala Power Ltd. Kochi, Kerala 2 x 15 kgs/hr CW Chlorination System.(Consultant : Fichtner Consulting Engineers (India) Pvt. Ltd.) 1999
Andhra Pradesh State Electricity Rayalaseema T.P.S. 2 x 10 kg/hr Chlorination System.(Consultant : Desein Ltd) 1995
Punjab State Electricity Board Guru Nanakdev T.P.S 2 x 5 kgs/hr Chlorination System (Consultant : Tata Consulting Engineer ) 1997
Rajasthan Atomic Power Project. Rajasthan 2 x 2 kg/hr Chlorination System 1997
M/s Envirad Projects Pvt. Ltd. NTPC Badarpur BTPS 1x1 kg/hr Vacuum Chlorinator 1998
Rajastan State Electricity Board Suratgarh T.P.S. 2 x 750 gms/hr & 2 x 75 gms/hr Chlorination System.(Consultant : Development Consultant.) 1998
M/s National Thermal Power Corp. Vidyut Nagar, U.P. Valves & Chlorination system accessories 1997 to 99
M/s National Thermal Power Corp. NTPC Auryia Gas Power Project Valves & Chlorination system accessories 1996
M/s Bechtel International Inc. Enron Power Project Dabhol - Phase II (Repeat Order) Chlorine Leak Absorption System 2000
BSES Ltd. 230 MW Combined Cycle Power Project Samalkot, Andhra Pradesh 2x60 kg/hr. CW Chlorination System with Leak Absorption System 2003
APGENCO Project-Kothagudem, A.P 2x50 kg/hr. CW Chlorination System with Leak Absorption System 2003
Test Data
Test Data